In
about 10 years (1991 to 2001) time the total population in the urban area
has increased from 1.69 to 3.3 million. Over the past decades the population
in the urban centers along the major highways, district headquarters and
market centers has been increasing rapidly mainly as a result of rural
migration. Increased urbanization, unplanned development and haphazard
concentration due to migration of hill population has led to critically
inadequate infrastructure services and depleting environmental and poor
sanitary conditions in these fast growing small towns of Nepal. The situation
has also led to declining quality of life due to inadequate water supply
and public health conditions of the residents, particularly low-income
group of people. It is common to see in these urban areas where women
folks are spending many hours for fetching water from distant sources.
Ministry of Physical Planning
and Works
The Ministry of Physical Planning
and Works (MPPW) is the ministerial-level institution with overall responsibility
for water supply and sanitation in the country. It reviews and approves
sector plans, policies, and the development budget. It supervises several
sector institutions, including the Department of Water Supply and Sewerage
(DWSS), Nepal Water Supply Corporation (NWSC), Rural Water Supply and
Sanitation Fund Development Board (RWSSFDB). NWSC is a semiautonomous
corporation responsible for water supply in major urban centers with current
operations in 28 major towns. The RWSSFDB is an autonomous institution
funded by the World Bank to support small rural water supply and sanitation
projects. MPPW also oversees the Melamchi Water Supply Development Board,
which is responsible for the Melamchi water supply project to bring water
from the Melamchi River to the Kathmandu valley.
Department of Water Supply
and Sewerage (DWSS):
The DWSS is the lead sector
government agency for water supply and sanitation (WSS). The DWSS formed
in 1972, and given responsibility for the sector that was formerly in
the hands of the Department of Irrigation. Before 1972, the Department
of Irrigation's mandate was to support WSS coverage for communities larger
than 1,500. The Ministry of Local Development had responsibility for smaller
systems. In 1987, all WSS responsibility was given to DWSS under the MPPW
umbrella, transferring management of DWSS from the Ministry of Water resources.
DWSS is now the lead agency
in the sector with responsibility for sector planning, coordination, technical
standards, management of design and construction activities for WSS facilities,
coordination of health and hygiene education, and construction of sanitation
facilities. Although current policy is to facilitate WSS construction
(with O&M the responsibility of Water User Groups), DWSS continues to
operate and maintain a number of larger water supply systems through its
Water Supply and Sanitation Division Offices. A Director General (supported
by two Deputy Director Generals) heads DWSS. DWSS has 10 technical sections
to carry out relevant central level activities:
1. Environmental Sanitation
and Natural Disaster Management Section
2. Sewerage Management Section
3. NGO and Community Mobilization Section
4. Electro-Mechanical Repair & Maintenance Section
5. Project Design and Progress Monitoring & Evaluation Section
6. Foreign Assistance Coordination and Planning Section
7. Human Resource Development, Training and Research Section
8. Appropriate Technology Development and Rain Water Harvesting Section
9. Water Quality Improvement and Monitoring Section
10. National Information Management Section
These sections provide both
national level coordination, and support to regional and division level
activities. The DDGs share responsibility for oversight of activities
in the five development regions with one responsible for the Eastern and
Central Regions and the other responsible for the Western, Mid-Western,
and Far Western Regions.
In addition DWSS has five Regional
Monitoring and Supervision Offices in five development regions, Water
Supply and Sanitation Division Offices in 43 districts and Water Supply
and Sanitation Sub-Division Offices in 27 districts. The total staff of
DWSS is 1798. The Regional Offices headed by Regional Director, coordinate
activities between central level and division level, providing technical
support as necessary and monitoring and supervising division level activities.
The division offices, headed by the Division Chief and Sub-Division Chief,
have engineers, overseers, water supply and sanitation technicians, woman
workers, and administrative support staff. The Division and Sub-Division
Offices:
- coordinate centrally funded
program activities with district development committees (DDCs), municipalities,
and VDCs;
- design new water supply
systems;
- manage the construction
process, including training for Water Users and Sanitation Committees
(WUSCs) and coordinating sanitation programs;
- operate and maintain water
supply systems that have not yet been transferred to WUSCs; and
- provide technical and financial
support to communities to overcome major water supply system problems.
Small Towns Water Supply
and Sanitaiton Sector Project (STWSSSP):
Government of Nepal has planned
to implement Small Towns Water Supply and Sanitation Sector Project (STWSSSP)
in order to improve health and quality of life of the people living in
the small towns by constructing new and/or rehabilitating and upgrading
the existing water supply systems, drainage and sanitation facilities,
and providing Health and Hygiene Education (HHE) program. The STWSSSP
presently under implementation with the financial assistance of the Asian
Development Bank is a part of the 15-year plan for small towns water supply
and sanitation development and will be implemented for a period of 6 years.
The project will provide water supply, limited drainage and sanitation
facilities in 40-50 towns with average populations of about 12,000 each
following a demand-driven, interactive procedure that ensures full participation
of the local water users' groups. The Asian Development Bank (ADB) is
funding the foreign exchange cost of the project from its special fund
resource as a loan to Goverment of Nepal. The project areas selected are
emerging small towns that meet the basic criteria defined by the 15-Year
Development Plan for Small Towns Water Supply and Sanitation Projects.
Objective of STWSSSP
The main objectives of the
project are to:
- improve water supply and
sanitation facilities and provide HHE program in each town;
- support community participation
in the development of water supply and sanitation facilities; and
- promote community based
water quality monitoring.
The project envisages a demand
driven approach for the development of water supply and sanitation services
to be designed and implemented in the small towns of the country. Town
residents' willingness to pay for the services is considered as basic
indicator of community demand. The selection of the project towns is on
the basis of competitive process by examining their capacity to share
a minimum of 20% of the construction cost, and repay through water tariffs,
an additional 30% of the cost over 12-15 years time. The project has the
following four components:
- Public Awareness Campaign
(PAC) and Health and Hygiene Education (HHE) programs.
- Water Supply and Public
Sanitation.
- Technical support to Water
Users and Sanitation Committees (WUSCs).
- Project Implementation Assistance
(PIA).
15-Year Development Plan
for STWSSSP
Government of Nepal , with
assistance of a variety of multilateral and bilateral donors, has made
considerable effort to provide improved water supply and sanitation (WSS)
services to people living in both the urban and rural areas of Nepal.
Current coverage of piped water supply is estimated to be about 68% throughout
the country. While the stated goal for water supply coverage in the Ninth
Plan (which ends in FY 2001/2002) was 100%. The achievement is far behind
the set target. Nonetheless, G/N continues to support efforts to improve
the health and well being of Nepali people through numerous ongoing WSS
projects. Two major multilateral donor-financed, the ADB-financed 4th
Rural WSS Project and the World Bank financed Rural WSS Fund Development
Board, are addressing the needs of many small and medium sized rural villages.
There have been past and currently planned projects (such as the Melamchi
Water Project, which is supported by a group of multilateral and bilateral
donors) focussing on major metropolitan areas. However, one major group
of water users that has yet to receive significant sectoral assistance
is in emerging small towns.
The 15 Year Development Plan
for Small Towns Water Supply and Sanitation quantifies the WSS needs of
that group of water users, estimates the cost of providing the improved
services that they require, and proposes an institutional framework through
which those services can be provided and paid for. For purposes of this
Plan, an emerging small town is defined as:
having a service area population of 3,000 - 40,000 people;
a population growth rate of at least 3%, and population density of at
least 40 persons per hectare;
located on all weather road on either the East-West Highway or one of
its major North-South feeder roads, or could be district headquarters;
meets certain criteria for hardship in terms of the limitations its current
WSS facilities;
has such basic infrastructure as gird electricity, banking facilities,
a secondary school, and a health post;
must have an average household income of at least NRs. 5,000 to insure
the affordability of cost sharing for the new facilities.
The Plan begins with a summary
of relevant demographic information about estimated growth rates in the
emerging small towns of Nepal, and explains the need for the Plan. There
is a brief overview of Water Supply and Sanitation (WSS) sectoral issues,
followed by a discussion of national policies that apply to urban WSS
development. Thereafter, a precise definition of emerging small towns
is given (as mentioned above). This definition is applied to a long list
of more than 200 candidate towns and about 30 additional towns are expected
to fall within the category during the period. Site selection criteria
are specified that will be used to choose individual towns for project
assistance as sectoral financing becomes available.
The technical aspects of water
supply, sanitation, and drainage are described as they apply to small
towns. The concept of service are as it applies to coverage (and ultimately
to project cost) is discussed. Levels of service (e.g. community taps,
house connections) are described. Since hand pumps are already commercially
available in most areas of Nepal where they can easily be used, it is
recommended that only piped water systems be supported with project funds.
In fact, where customers can afford it, they nearly always prefer the
convenience of piped water supplies with house connections. The types
of private and public sanitation facilities that will be financed with
project assistance are described. The need for a community based education
program to encourage better sanitation and hygiene practices is stressed.
This will help to maximize the significant benefits of improved community
health and consequent productivity.
The cost of each of the major
project and program components are calculated, based on the long list
of small towns, the current state of their WSS facilities, and an estimate
of the extent of improved WSS services required. Water and sanitation
systems cost are based on current per capita costs for gravity water systems
(in the hills towns) and pumped tubewell systems (primarily in the Terai).
The overall estimated program cost for 209 towns with an average population
of just over 10,000 people each was calculated to be about NRs. 12.132
billion (US$ 177.11 million). This amount includes the cost of WSS construction,
as well as the cost of required support services for project management,
community and institutional training, technical assistance, logistics
(building, equipment and vehicles), benefit monitoring and evaluation,
and water quality monitoring.
Clearly, this is an amount
well beyond the financial resources currently available to Government.
Extensive, broad-based financial support will certainly be required from
both multilateral and bilateral donors to achieve the goals and objectives
of this ambitious but necessary program. In addition, reflecting the new
government policy on cost sharing the development cost for urban infrastructure,
significant resources would be mobilized from, beneficiary communities
to co-finance this program.
In particular, beneficiaries
will contribute some percentage of upfront co-financing of the total WSS
construction cost, and will also pay back some additional cost of the
total construction through water tariffs over the first fifteen years
after completion of construction. These tariffs will cover O & M,
repair, system expansion, and debt servicing.
The recommended institutional
framework through which the planning and implementation of this plan would
take place is described. The community would be the owner of the new or
rehabilitated facilities based upon their upfront co-financing, complemented
by their repayment over time of a significant portion of the construction
loan. The design of the improved WSS facilities would be demand responsive,
meaning that people would get the level of WSS services they want and
are willing to pay for. The community itself, represented by the WUSC
or the WSS Section (in the case of a Municipality), will be responsible
for long-term operation and maintenance.
Given the broad scope and cost
of the program, NGOs and the private sector would play significant roles
is assisting DWSS and the participating towns in project planning and
implementation. This will help DWSS to focus on its role as program facilitator
rather than implementator.
Salient Features of the
Project
|
(a)
|
Project Title :
|
Small Towns Water Supply
and Sanitation Sector Project
|
|
|
|
[Loan No. LOI/L 1755-NEP
(SF)]
|
|
(b)
|
Funding Agency :
|
Asian Development Bank
|
|
|
Borrower :
|
Ministry of Finance,
Government of Nepal
|
|
|
Executing Agency :
|
The Ministry of Physical
Planning and Works (MPPW)
|
|
|
Implementing Agency :
|
Department of Water Supply
and Sewerage (DWSS)
|
|
|
Project Management :
|
Project Management Office
(PMO) under DWSS
|
|
|
|
Town Development Fund
(TDF),
|
|
|
|
Local Government,
|
|
|
|
Water Users and Sanitation
Committee (WUSC)
|
|
|
|
|
|
(c)
|
Project Area :
|
About 40-50 new emerging
small towns all over Nepal
|
|
|
|
|
|
(d)
|
Scope :
|
|
|
|
Improves
water supply and sanitation conditions in 40-50 new small towns
with average population of about 12,000 each and about 0.6 million
people will be benefited from the project. The overall benefit
is the improvement of health and quality of life of the people
by constructing water supply, sanitation and drainage facilities.
The project requires the beneficiaries to make contribution in
cash or kind to cover partial project cost (about 20% during implementation
and 30% loan payback in 12-15 years period after commission).
The institutional capacity of the WUSCs will be developed with
the support of technical and financial training. The project also
promotes community based water quality monitoring and establishes
Operation and Maintenance (O & M) system within the WUSCs.
Major four components envisaged in the project are:
|
| |
Part A : Public
Awareness Campaign and Health and Hygiene Education (PAC and HHE)
In all project towns,
non-government organizations (NGOs) will be hired to carryout
the program with focus on (i) Community Health, Hygiene and Sanitation
Awareness (ii) Participation in all aspects of project implementation
and creation of project ownership, and (iii) Construction of in-premise
private sanitation facilities.
|
| |
|
| |
Part B
: Water Supply and Sanitation Facilities
The component mainly comprises of the construction improvement
or rehabilitation of water supply schemes, basic storm-water drainage
and sewerage with communal septic tanks and public latrines.
|
| |
|
| |
Part C
: Technical Support to WUSCs
The component mainly provides various types of technical and financial
training to WUSCs. Establish technical support center in each
of the five regional offices of the DWSS. The technical training
in each of the project towns mainly covers
|
| |
|
| |
(i) system operation
(ii) preventive maintenance,
and
(iii) water source protection.
|
| |
Financial training
covers tariff planning, billing, collection and basic accounting.
Other trainings dealing with :
(i) engineering and
technical support
(ii) water quality monitoring and testing
(iii) water meter calibration,
(iv) knowledge and skills on appropriate handling, storage and
use of drinking water, etc. are also provided to ensure that
WUSCs develop sufficient capacity to manage the completed water
supply system.
Part D : Project Implementation
Assistance
This component mainly covers:
-
Provision of consulting
services for project implementation, sub-project feasibility
study, engineering design, construction supervision and training.
|
| (e) |
Project Dates :
| Loan Agreement Date
: |
18 December 2000 |
|
Loan Effective
Date :
|
16 March 2001
|
|
Project Completion
Date :
|
30 June 2006
|
|
Loan Closing Date:
|
31 December 2006
|
| Loan Closing Date: |
30 September 2008
(After the extension of 21 months) |
|
| (f) |
Implementation Schedule:
Recruitment of consultants
for Project Implementation Assistance - 3 August 2001.
-
Recruitment of
4 engineering design consultants for detail engineering and
construction supervision of 8 pilot sub-project under Phase
I - 30 August 2001 to 5 September 2001.
-
Recruitment of
8 NGOs to carryout PAC and HHE in 8 pilot sub-projects under
Phase I - 7 September 2001
-
Recruitment of
7 Engineering Design Consultants for feasibility, engineering
design and construction supervision of 15 sub-projects under
Phase II - 31 June 2002.
-
Recruitment of
14 NGOs to carryout PAC and HHE in 15 sub-projects under Phase
II - July 2002.
-
Sub-project selection
- users application for town project demand: 45 sub-projects
|
| (g) |
Financing Plan :
| Total |
|
|
|
Project Cost:
|
|
|
|
ADB Financing :
|
|
|
|
Foreign Currency
:
|
|
|
|
Local Currency
:
|
|
|
|
Government of Nepal
Financing :
|
|
|
|
(Local Currency)
|
|
|
|
Local Beneficiaries
:
|
|
|
|
(Local Currency)
|
-
|
|
|
Local Government,
|
|
|
|
VDC/Municipality
:
|
-
|
|
|
(Local Currency)
|
-
|
-
|
|
| Project
Cost and Financing Plan |
|
Project
Cost
The total cost of the project is estimated to be an equivalent
of US$ 53.9 million at August 2000 prices of which, US$ 29.7
million equivalent is the foreign currency cost including
the services charge during construction, and US$ 24.2 million
equivalent is the local currency cost including duty and taxes.
The details are as follows:
|
Summary
of Project Cost (In million US$)
|
|
S.N.
|
Description
|
Foreign Exchange
|
Local Currency
|
Total Cost
|
|
I
|
Part A: Public
Awareness Campaign & HHE
|
-
|
2.28
|
2.28
|
|
Part B: Water Supply
and Sanitation Facilities
|
28.15
|
14.17
|
42.32
|
|
Part C:Technical
Support
|
0.33
|
0.14
|
0.47
|
|
Part D: Project
Implementation Assistance
|
0.51
|
7.61
|
8.12
|
| |
Sub-Total(I)
|
28.99
|
24.20
|
53.19
|
|
II
|
Interest during
Construction
|
0.68
|
-
|
0.68
|
| |
Total
|
29.67
|
24.20
|
53.87
|
| |
Percentage
|
55.085
|
44.92%
|
100%
|
|
|
Financing
Plan
|
| Based on
above project cost, the Bank has provided a loan equivalent to SDR
26, 649,000 from its special fund Loan No. 1755-NEP (SF), from which
US$ 35 million (at August 2000 exchange rate) is available to meet
about 65% of the total project cost. The Government will finance approximately
US$ 10 million, including approximately US$ 0.65 million for incremental
administrative expenses. Local government and beneficiaries are expected
to contribute US$ 0.458 million and US$ 8.59 million respectively
towards the construction cost of water supply and sanitation valued
in terms of time, labor and materials. The details of financial plan
are summarized as follows:
| S.N. |
Cost
Items |
Cost
(US$'000)
|
ADB
|
Government |
Local
Government |
WUSC |
|
%
|
US$'000
|
% |
US$'000 |
% |
US$'000 |
% |
US$'000 |
|
1.
|
Civil
Works |
| i.
Water Supply |
40200 |
60 |
24120 |
20 |
8040 |
|
|
20 |
|
| ii.
Public Sanitation and Drainage |
2288 |
80 |
1830 |
|
0 |
20 |
458 |
|
|
| iii.
Private Latrines |
1100 |
|
0 |
50 |
550 |
|
|
50 |
550 |
|
2.
|
Equipment
and Vehicles |
1050 |
90 |
945 |
10 |
105 |
|
|
|
|
|
3.
|
Consulting
Services and Training |
5006 |
90 |
4505 |
10 |
501 |
|
|
|
|
|
4.
|
NGO's
Services |
1179 |
90 |
1061 |
10 |
118 |
|
|
|
|
|
5.
|
Incremental Administrative Expenses |
2366 |
70 |
1656 |
30 |
710 |
|
|
|
|
|
6.
|
Interest
During Construction |
680 |
100 |
680 |
|
|
|
|
|
|
|
TOTAL |
53869 |
64.6 |
34797 |
18.6 |
10023 |
0.85 |
458 |
15.95 |
8590 |
|
|
Implementation
Arrangement
|
|
The
Ministry of Physical Planning and Works (MPPW) is the executing
agency of the project and Department of Water Supply and Sewerage
(DWSS) is the implementing agency. DWSS has established a Project
Management Office (PMO) under STWSSSP to manage the project on a
day-to-day basis. The main thrust given in the implementation of
the project is to maximize the decision powers of the local communities
with regard to the design, implementation and O & M of each town
project while engaging DWSS as the facilitator, instead of implementer
in coordinating the overall project activities, and monitoring and
reporting project progress. Several stakeholders are involved in
the project financing for water supply and sanitation component
at different stages of implementation.
Water
Consumers' Association (WCA) & Water Users And Sanitation Committee
(WUSC)
In each town project
Water Consumers' Association (WCA) will be registered at District
Water Resource Committee as per the provision available in Water
Resource Act 2049 and Water Supply Regulation 2055. The association
will form Water Users and Sanitation Committee (WUSC) who will perform
all tasks on behalf of the Association on matters related to water
supply and sanitation development within the town service area.
The WUSC on behalf of the community will bear the financing plan
as follows:
Project financing
for water supply components which covers:
- WUSCs contribution
of initial cash deposit of 5% of project cost; and
- WUSCs contribution
in kind of 15% of project cost making a total of 20% of the construction
cost.
In addition to
the above WUSC will disburse 30% of capital cost of the project
during construction at an interest rate of 8% per annum out of the
soft loan borrowed from Town Development Fund (TDF) within the maturity
period of 12 to 15 years of operation of the town project.
Project
Management Office (PMO)
DWSS has established
a Project Management Office (PMO) under STWSSSP to manage the project
in all aspects of implementation. The Project Implementation Consultants
(PIC) will support PMO for implementation and coordination of the
towns project. PMO will establish at each town a Town Project Office
(TPO). TPO will coordinate with engineering Design Consultants,
NGOs, Local Government and WUSCs in project related field activities
assisted by the implementation consultants. At the central level
Project Coordination Committee(PCC) has been established under the
Chairmanship of Secretary, MPPW comprising of Joint Secretary of
MPPW(Alternate Chair), Director General of DWSS, Executive Director
of TDF, a senior official from each of the Ministry of Finance,
Ministry of Local Development, and Ministry of Law, Justice and
Parliamentary Affairs respectively, and the Project Manager to maintain
overall coordination and liaison on matters related to Project activities
with Project related departments and agencies. The Project Manager
acts as the Member Secretary of the committee. The PMO is responsible
to disburse 50% of town project construction cost for water supply
and 80% of construction cost for sanitation and drainage facilities
development.
Town
Development Fund (TDF)
Town Development
Fund (TDF), a government owned autonomous body has been involved
to provide financial and institutional support to the project. TDF
will lend 30% of the construction cost incurred on water supply
facilities development in the town projects and collect loans with
an interest of 8% per annum in a period of 12-15 years from the
communities. TDF will examine the town projects' costs in connection
with debt servicing capabilities of the local governments and WUSCs.
It also recommends and monitors water tariff in the project to cover
at east O & M and 30% debt service payments, and provides training
to users on financial planning, specially on book keeping and tariff
setting. Project agreement between ADB and TDF has been signed on
18 December 2000 according to which TDF has agreed to take obligation
by providing 30% loan to WUA against the construction cost of the
project.
Local
Bodies
Local governments
are responsible for providing the initial information required for
town project application and ensure to establish WUSCs in town projects
service area. Against application from the local body and WUSC for
project funding, endorsed by the concerned district development
committee ( DDC ) is required to be submitted to PMO for demanding
the town project. The joint application from the local body should
also guarantee on repaying the dept to TDF on behalf of the communities.
The local body is required to contribute at least 20% of the construction
cost of the public sanitation components including surface drainage
construction activities in the towns.
Implementation
Procedure
The project is
based on an approach of demand-driven through an interactive process
involving significant community participation. Project cycle starts
from a joint application from the local government and WUSC with
DDC endorsement and the other activities consists of:
- Joint application
from local government, WUSC and DDC.
- Evaluation and
prioritization of applications.
- NGOs selection
to conduct public awareness campaign ( PAC) .
- Signing of community
action plan (CAP) by WUSC.
- Feasibility
study from engineering design (ED) consultants.
- Confirmation
of feasibility study by PMO, TDF and WUSC jointly.
- Detailed engineering
design from ED Consultants.
- Town project
agreement signed by WUSC and PMO.
- Tendering and
bid evaluation by PMO and WUSC.
- Construction
supervision by ED Consultants, TPO and also fulltime women representative
deputed by WUSC.
The interactive
process outlined will improve the level of sustainability followed
closely with affordability enhancing the ownership by the local
communities.
Implementation
Schedule and Project Framework
The project is
to be implemented from December 18, 2000 to June 30, 2006. The further
detail of implementation schedule is presented in Implementation
Schedule.
Towns
Project Selection Criteria
Town projects are
selected on the basis of mainly the community's willingness to contribute
a minimum of 20% of the construction cost including minimum of 5%
of the cost for cash and repay through water tariff an additional
30% of the cost over a time period of 12-15 years of operation.
Selection criteria have been developed for screening and prioritizing
the town project based on the existing water supply and sanitation
condition, service level, hardship and willingness for participation
by local bodies and WUSCs. The criteria for screening and prioritizing
of the town projects are presented in Screening Criteria for Qualification
and Evaluation Criteria for Prioritizing Towns.
|
|
Procurement
of Goods and Services
|
|
Procurement of
goods and services financed by the Bank are being carried out by
DWSS in accordance with the Bank's Guidelines on Procurement. Except
the procurement of consulting services, vehicles and office equipment
there is no bulk procurement of materials to be executed by DWSS.
All civil works and supply of materials (pipes, fittings, pumps
and others) for each town project are packaged in one bid contract
and each source package contract costing more than US$ 1 million
will be awarded on the basis of International Competitive Bidding
(ICB) procedure. For each single package contract to cost US$ 1
million or less will be awarded under Local Competitive Bidding
(LCB) procedure. Contract valued more than US$ 500,000 required
for the procurement of vehicles and equipment, ICB procedure is
used and International Shopping Procedure (ISP) is used for procurement
of contract valued at US$ 500,000 or less. Direct Purchase (DP)
to cost less than US$ 100,00 is executed based on the Government's
normal practice for the goods to be procured.
Civil works construction
and related equipments supplies such as pipes, fittings, pumps and
other accessories including all other construction materials for
each town projects shall be combined into single contract package.
Each such contract to be awarded for a project town shall be referred
as a civil work contract.
Equipment and vehicles
required for the project are in the process of procurement following
the Bank's IS or DP procedure. Vehicles, financed by the Bank are
of the standard 4WD jeeps, double cab pick-up variety, which are
ideally suited for the field conditions. Before the commencement
of any procurement, a list of equipment and vehicles to be procured
with detail cost estimate were submitted to the Bank in the procurement
plan.
|
|